Unitary dossier · 7 June 2018

Material takeover, exclusion and alleged insolvency overreach.

The evidence describes Sun Park as occupied and registered as active shortly before 7 June, with guests and service and maintenance activity. That does not determine the lawful operator at that date or prove that Pink or CEXP retained operation or possession. This record explains how authority limited to LPB spread materially over a complex of fragmented titles.

Contemporary control

The record does not show an empty or inactive complex on 7 June.

It needed investment and modernisation. That did not make it available for possessory self-help. This conclusion concerns the complex’s condition and activity; it is not a finding that Pink or CEXP was then the lawful operator.

Integral redevelopment already studied

A Las Palmas architect developed measurements, three-/four-star refurbishment and expansion options, technical studies, and a basic/execution-project route conditional on licensing. The plan was staged to preserve operations.

An earlier model apartment

A specialist Tenerife contractor prepared designs and renders and received a 30% payment—€1,923.43—with the transfer reference “Reforma Piloto SPL”. Works photographs and emails connect it to commercial preparation and a tour-operator filming visit.

Phased works, without sacrificing a season

The contemporary instruction was explicit: refurbish “in phases” and avoid losing another tourism season. By early 2018 the objective was framed as a €1.5m repositioning to four-star level. That was a refurbishment objective, not a category already obtained.

Completed, occupied and registered as active

The independent ECO valuation issued on 7 June described the property as completed and occupied, in good condition without apparent structural deterioration, registered as operational, and with some rooms already updated. Mortgage value: €25,647,179.50.

The live alternative

ONA led a documented operating exit proposal with identified finance routes.

The file documents a contracted operator, proposed hotel continuity, bridge finance and two take-out routes. Conditions, verification, approvals and closing still remained.

  1. Elaia / LaguneDocumented €26m own-funds downside route: buyer-signed proposal plus Aweswell-signed preferred-acquisition instrument circulated as agreed.
  2. ONA HotelsFifteen-year hotel lease signed for the proposed perimeter, subject to conditions precedent and later ratification.
  3. Material ruptureForced access, chains, security, key control and exclusion described in testimony and contemporary reports.
  4. Stoneweg / Varia binding conditional offerAfter the agreed call, Stoneweg itself issued the Oferta Vinculante Condicionada for the next day's judicial meeting; transaction-closing conditions remained.
  5. Judge and administrator reportedly informedThe Irigoyen report describes meetings on payment/deposit of liabilities and conclusion; it is not a court minute.
  6. Diligence incompleteONA reported an exterior-only inspection amid conflict and police presence; it obtained no apartment access.

How it worked

Operate, pay or deposit, refinance or sell—not stop the hotel.

The ONA contract contemplated continuity of staff, reservations and maintenance. Bridge finance was to lead to bank funding or the integrated Elaia/Lagune sale/takeout route. Stoneweg's own 12 June email establishes that the binding conditional offer stage had closed before the Las Palmas meetings; owner ratification and transaction-closing conditions still mattered. That is why loss of access affected diligence, operation, security and closing. Open the mandate, billing and implementation reconstruction →

15 years
signed ONA agreement
220
units in proposed perimeter
€26m
documented Elaia/Lagune route
12 June
Stoneweg offer issued
1 day
ONA signing to takeover
No access
incomplete July ONA visit

Preparation, authority and execution

Security for LPB was not a title to take the hotel.

On 18 May the insolvency administrator, representing LPB, asked that the Community retain security to control access and preserve areas. The minutes do not deliver possession to CAM or authorise exclusion of the onsite manager, guests, staff or persons asserting operational or possessory rights, entry into others’ property or complex-wide transformation.

7 June 2018 · material takeover by force at access points

No possession order appears. A forced lock, chains, replaced cylinders, uniformed control and exclusion do.

Documentary conclusion: an eyewitness testified under a duty of truth that he saw the coded lock broken, chains and padlocks fitted, cylinders replaced and entrances closed. He attributed operational instructions to Laura Patricia Acosta Matos and made clear that José Daniel Acosta Matos was not present that day.

16 April · Commercial Court 1

Future realisation, not possession

The order approved a transfer/sale route for LPB assets with publicity and competing offers. It did not order handover of the hotel, eviction, broken locks or operator replacement.

7 June · contemporary report

Entry formally contested

The same-day email reports that those arriving said they came to “take possession”, demanded keys, identified guests and told the onsite manager it was over. It is a contemporary account; police, CCTV and security logs must corroborate each act.

25 June · judicial testimony

Continuing exclusion

The onsite manager testified that access control kept him from his workplace from the 7th; he entered only with a notary and for a sanitation intervention. He said he could not retrieve tools and machinery.

8 June · contrary account

CAM allegedly entered only its units

A contemporaneous party note of a call attributed to the administrator said CAM entered only its own units and common areas. It was challenged immediately. That conflict requires a map of keys, properties, cameras and security incident reports.

Guests and residents

Access under private guards

Independent resident emails from June and July describe permanent guards, gate-level access decisions, lock removal, contacts routed to Acosta Matos and residents leaving. The complete guest, booking, luggage and refund record remains missing.

Staff and operation

De facto displacement, not judicial eviction

Judicial evidence supports exclusion of the onsite manager. Other communications report staff or operators absent or told to move. A universal expulsion should not be stated without payroll, rosters, statements and termination records person by person.

Maintenance

Pools, gardens and operation

Residents and the ONA visit described non-operational pools and unmaintained gardens. The 9 July images establish visible condition, not authorship. They must be tested against the earlier valuation, incident reports, orders, suppliers and exact control period.

Business and value

Bookings, goodwill and insolvency exit

The documented access control affected apartment access and due diligence by the proposed operator ONA; the alleged effect on bookings, goodwill and continuity requires PMS, banking and accounting evidence.

Downstream media and booking-promotion example · subsidiary recordMike and Julie Cliffe-Jones: Lanzarote Information retained an adverse Sun Park narrative while Camel Travel promoted MYND Yaiza and invited quotation requests
Page from the insolvency administrator's judicial statement of 31 July 2018
31 July 2018 · administrator’s statementDenial and admissions in one act

He denied ordering the coded entrance broken, but admitted access, one forced door and general Community authority; as to locks broken to carry it out, he said he “accepts it as good”.

Photographic dossier of 9 July 2018 showing deteriorated Sun Park pools and surfaces
9 July 2018 · party-prepared photographic recordCondition depicted; date, cause and authorship to reconcile

The images depict a visible condition on the date attributed to the dossier; by themselves they do not prove date, cause or authorship. They must be tested against metadata, access logs, maintenance records and the earlier Gesvalt inspection.

Fiduciary bridge and protection

Insolvency authority was critical precisely because it was limited.

The administrator had to preserve and represent LPB’s patrimony; the judge had to supervise the insolvency and decide applications. Neither was Sun Park’s universal manager. But that limit does not make them spectators where authority or a decision concerning LPB produces whole-hotel effects.

01Insolvency administrator

Francisco de Borja Rodríguez-Batllori Laffitte

He requested the Community security item for LPB and admitted access authorisations. Once notified, the verifiable questions are which properties he identified as LPB’s, what inventory and activity he preserved, how he checked implementation, what he reported to court and what relief he sought if he considered the instruction exceeded. His authority did not, by itself, reach CEXP or non-estate properties.

Minutes + statementScope, safeguards and response unresolved
02Judge in Insolvency 36/2012

Supervision, notice and useful relief

The 16 April order did not grant CAM possession. The Irigoyen report places the finance-backed exit proposal before judge and administrator on 13 June, but needs corroboration. The record later contained disputes over the separate sale, works and inspection. The question is what effective protection was decided while the hotel, evidence and ONA route could still be preserved.

Notice to be testedAn adverse decision does not prove prevaricación
03Institutional result

Roll 1010/2018 / Order 804/2018: criminal dismissal did not create CAM title

DI 1103/2018-00 → Preliminary Proceedings 1132/2018, NIG 3500443220180003508, were provisionally dismissed on 20 August. Order 804/2018 of 13 November, issued in Roll 1010/2018 by Section Two of the Las Palmas Provincial Court, rejected the appeals, treated the dispute as essentially civil and relied centrally on the administrator’s account and authority. Its reasoning was adverse to the criminally protectable possession CEXP asserted and treated Pink’s formal possession as delivered on 22 May 2017. It was not a civil or tourism-title trial and did not create CAM title. See the roll identity, panel, representation, limits and open gaps →

Adverse official outcomeNo trial or civil/tourism title determination
“I allege that authority over LPB was converted into a bridge to non-estate control: private actors executed; the administrator enabled or failed to correct the overreach; and judicial protection did not stop it in time.” — Gil Marer

This is an attributed accusation subject to proof. No direct evidence has been located of a clandestine agreement, illicit benefit to the administrator or judge, or a decision establishing criminal intent.

Decisive evidence: original instructions, notice timeline, property-by-property inventory, measures requested and decided, ONA communications and a reconciled loss-and-benefit account.

From control to project

After the disputed 2018 control, evidence of pilot rooms emerged before LPB title passed in 2022.

The pilot does not establish by itself who commissioned it or with what authority. Its potential evidential significance arises from placing it between the 2018 material control, later party accounts of a whole-hotel proposal under “Lava Verde”, proposed complex-wide rollout and later investor representations.

Direct commercial source · authenticated emails 4–5 February 2020

Atilano Jesús Sastre Hernández · Inmoturismo

Atilano wrote as “Atilano Sastre” under the professional presentation Inmoturismo Hotel Consultancy and as Essenthia’s Canary Islands Contract and FF&E delegation. Public sources of the period identify him as Inmoturismo’s CEO; its profile covered hotel expansion, management, rehabilitation and contract work. In this file he is an independent professional source, not an accused actor.

What he said
Sun Park was the same establishment they knew as “Lava Verde” and “we manufactured and installed a pilot room some months ago”.
What he clarified
The interior design came fully defined by the commissioning side; the factory manufactured and installed and dealt with “the construction company”; he supported and accompanied its staff.
What he did after learning of the conflict
He said he notified the hotel-furniture factory they represented in the Canary Islands and that the factory referred the matter to its legal department.
Public profile
InteriHOTEL Canarias identified him as Inmoturismo CEO in a professional hotel-renovation discussion.
Mercantile context
The 2017 BORME records him as joint administrator of Suncanarias Gestión y Marketing, S.L.; no document has yet made that entity, Inmoturismo or Essenthia the contracting party for the pilot.

Boundary: his emails directly record his statement that the represented factory had manufactured and installed a pilot and that Sun Park was the establishment they knew as Lava Verde. They do not directly name CAM or identify the room, registered owner, consent, payer, order, licence or access authority. An unsigned party memorial dated January 2020 attributes the commission to the CAM perimeter around June 2019; it is not Atilano’s direct confirmation and requires corroboration.

Corporate engagement · individual identity withheld

The then Canary Islands regional head of El Corte Inglés Empresas

In June 2020, Gil Marer met the then regional lead at his Santa Cruz de Tenerife office. The corporate appointment on 12 June, later arrangements at that office, Aweswell’s onboarding and the Works/Projects/Installations estimate establish a genuine engagement concerning an integral refurbishment.

Contemporary meeting account
It records that CAM had invited him to Sun Park months earlier, showed four pilot rooms produced by independent suppliers, and asked him to value the selected model for possible replication across 318 accommodation units and 40 premises, as well as study the complete renovation.
Direct ECI evidence
Aweswell onboarding to prepare an offer and an estimate sent on 14 July at the regional lead’s instruction.
Preliminary estimate
€65,699,274 for a broader concept: rehabilitation of 204 rooms, expansion to 216, exterior areas, preliminaries and installations.
What is not alleged
El Corte Inglés Empresas is not shown to have built a further pilot and no signed CAM contract is located.

Boundary: the CAM visit, four pilots and replication request come from a party memorial dated 12 June 2020, not a signed statement from the regional lead or El Corte Inglés. CRM, visit, drawings, request for proposal and internal project records remain to be produced.

The threshold did not end on 7 June

Control without title → lost operation → debt and levy → title and operation.

A continuing consequence does not automatically make the initial act a permanent offence or every later actor guilty. It does require every new act to be tested: who adopted it, under what authority, with what knowledge, over whose patrimony, for whose benefit and against which lawful explanation.

4 February 2022 · attendance

20.993% present or represented

The minutes describe unanimity among those attending. None of the three corporate representations retained on the public page is LPB or Matkator; the remaining nominal list is redacted, and notice, powers, voting, abstentions and conflicts remain open.

Project and potential beneficiary

Three Acosta Matos companies represented

José Daniel Acosta Matos chairs and explains the sole project, supplied by CAM. Laura Patricia Acosta Matos represents CAM; Javier Acosta Matos, whose identity is CAEPR-confirmed, represents the distinct CAEPR-confirmed Construcciones Acos-Matos, S.L.

LPB · inside the insolvency

€4,460,145.93 arithmetic burden

The controlled annex reading attributes €1,199,729.12 Community debt and a €3,260,416.81 levy to LPB. The sum does not prove enforceability, double recovery or valid debt.

Matkator · outside LPB's estate

0.770% → €34,402.01

This is a derivation from the coefficient and the €4,467,793.26 budget, not a transcription of the withheld annex. It must be checked before evidential use.

Why charge LPB and Matkator instead of placing every cost on CAM?

The strongest lawful explanation appears in the minutes: they separate common works said to be “strictly necessary” for operation in the existing category—allocated among owners—from the additional four-star upgrade, which CAM offers to undertake at its own cost. A valid common work may also benefit the sponsor without becoming criminal.

The adverse hypothesis is more precise: if actors already developing the conversion knowingly classified project-enabling capex as a common expense, used invalid debt/voting machinery to impose it through 20.993% attendance, and shifted most cost to owners already deprived of use and income, the minutes may constitute a new patrimonial act. Proving that requires authority, debt, voting, technical cost classification, implementation, benefit and intent; sequence alone is insufficient.

The contradiction requires a title fork, not a sum: the minutes call CAM the principal interested majority owner, but the controlled annex still attributes LPB a 72.976% coefficient, €1,199,729.12 debt and €3,260,416.81 levy. If CAM was not yet the majority owner, test the truth and authority of that premise before deed no. 457; if CAM already was majority owner or economically controlled those properties, explain why LPB still bore the dominant quota and charge. Matkator was outside the insolvency and requires its own property-by-property chain.

This is not arithmetic: it is a chain of authority, reuse and causation.

No offence is proved by adding a €4.467m budget/levy, €6.57m of RICPE/RIC finance, a €3.44m subsidy, eligible investment, FEDER and revenue. They are different legal objects. The relevant proof is whether the same properties, works, invoices, jobs, availability or value were reused or described incompatibly; what each applicant disclosed about title, insolvency, third-party rights, related parties and other support; and which person knew, approved, certified, paid or used each proposition.

The unitary reading is: control/exclusion → loss or displacement of operation, guests, cashflow and funded exit → debt and reduced defensive capacity → voting/levy/project → title and CAM→HNT segregation → RICPE/RIC, regional incentive, FEDER and MYND operation. Each arrow requires its own proof; none automatically transfers guilt.

Omnidirectional bridge · 2018 → 2022 → later use

The meeting and ACTA are a conversion junction, not an isolated minute.

Gil Marer and Aweswell allege that preparation, selective exclusion, the meeting, resolutions, documentary closure, no direct communication and later use formed one enabling episode. The map displays that prosecution theory. It does not turn its arrows into proved causation or collective guilt.

  • Documented
  • Attributed allegation
  • Inference
  • Open proof
  • Lawful alternative / contrary
Inputs · conditions created before the meeting
Allegation + documented parts

Material control and “hotel mobbing”

Access and security, removal of guests, lost operation/cashflow, deterioration or works, frustration of the ONA exit and reduced defensive capacity are alleged as cumulative pressure from 2018.

7 June control →
Documented perimeters

LPB inside; Matkator outside

LPB was in insolvency and subject to insolvency administration and judicial supervision. Matkator was not estate property. No authority over LPB alone covered its units.

Active estate and limits →
Documented functions · status open

Captured Community / de facto control

Debt, voting, notice, security, access, maintenance, banking and custody formed a functional apparatus. “Capture” and de facto administrator remain actor-specific legal characterisations to prove.

Audit Community–IA →
Documents + knowledge inference

Project before title

Pilots, plans, the four-sibling image, RICPE promotion and 2021 filings justify production of project and board files. They do not alone prove knowledge of the call.

Pre-title project →
4 February 2022 · alleged enabling episode

Prepare → call → decide → document → communicate or withhold → use

The meeting and its resolutions are documented in a located copy. Deliberate recipient selection, common purpose and every causal use remain open.

  1. PrepareProject, title, owners, coefficients, debt and budget.
  2. Design the callOrgan, agenda, first/second call and lawful-recipient list.
  3. Serve or omitService, returns, noticeboard, powers, conflicts and attendance.
  4. ResolveDebt, levy, CAM project, licences, bank and unitary operation.
  5. Construct the ACTARecitals, CAM majority, attendee unanimity, signatures, closure and book.
  6. Communicate or useDirect delivery, Thompson relay, certificates, litigation, title, works and finance.

Reading rule: each ⇄ means “bridge to prove in both directions”: fact → use/effect and result → document/custodian expected to explain it. It does not mean agreement, intent or causation has been proved.

Outputs · portable capacity created by resolutions and ACTA
Service/use chain open

LPH and procedural portability

Debt, loss of vote, absent-owner assent, challenge time, certification and collection depend on valid call and communication. A defective ACTA is not therefore a criminal falsehood.

LPH gates →
Temporal link · causation open

Procedural/insolvency fraud and deed 457

The prosecution case must identify the false or omitted proposition, user, induced error or patrimonial decision, harm and benefit. The meeting preceded the deed by seventeen days; proximity is not causation.

2022 adjudication →
Separate tracks · crosswalk pending

RICPE/RIC · regional incentive · FEDER

Amounts are not added. Cross-match property, work, invoice, job, title/authority statement, other support, payment, certification and beneficiary to detect reuse or incompatibility.

Funds traceability →
Traceable benefit · separate liability

CAM → HNT → MYND

Segregation, works, operation and revenue permit value and benefit tracing. They do not automatically transfer intent, corporate crime or successor guilt.

Financial lives →

“Hotel mobbing”

This is Gil/Aweswell’s attributed umbrella label for sustained pressure on access, guests, operation, assets, evidence, funded exit and defence. It is not a standalone offence: each episode must, if appropriate, satisfy coercion, usurpation, damage, frustration, falsity, disloyal administration or another offence separately.

Measure the funded exit →

Were the assets “court-protected”?

The accurate phrase is: LPB assets formally subject to insolvency-administration and judicial-supervision safeguards, whose practical effectiveness is disputed. That is a protection architecture, not a guarantee of outcome. Matkator remained outside it.

Audit supervision and response →

De facto administrator does not mean influence

The record supports inquiry into de facto control of discrete functions. Legal status in relation to LPB requires stable autonomous management or habitual decisive influence, instructions followed, continuity, knowledge, benefit and the date-specific standard.

Apply the functional test →

Official historical LPH consolidation applicable before the 4-February-2022 meeting →

Horizontal Property Law on 4 Feb 2022What must be testedConsequence
Arts. 3, 5 and 7
private property, quota and works
Title, statutes, property by property, consent and works/operation perimeter.A Community resolution does not confer private title or universal hotel authority.
Arts. 9 and 10
expense, notice and necessary works
Notified address, attempts, returns, noticeboard/diligence; common, necessary, private or four-star character.Necessary work can be mandatory; its label and notice route must match reality.
Arts. 13, 14 and 20
organs and administrator
Appointment, competence, instructions, custody, bank and implementation.Representing the Community does not authorise disposition of every private property.
Arts. 15.2 and 16
debt, voting and call
Matured debt, challenge/consignment, disenfranchised-owner list, first/second call, agenda and service.Debt may remove a vote; it does not remove notice, attendance and deliberation rights.
Art. 17
applicable majority
Classify each resolution and reconstruct owners, quotas, votes, abstentions and affected-owner consent.20.993% alone does not invalidate a second call; attendee unanimity is not always total-owner unanimity.
Arts. 17.8, 18, 19 and 21
absentees, minutes, challenge and collection
Valid citation, later agreement/minutes communication, dissent, diligenced book, certificates and debt proceedings.Without proved citation and communication, absentee assent and the start of the challenge period cannot simply be assumed.

The complete allegation: deliberate concealment until after the meeting.

Confirmation of the proposition under investigation: Gil Marer states that his relevant perimeter received no invitation or pre-meeting knowledge and no direct Community ACTA communication; the Thompson family forwarded the ACTA only after the meeting. Gil and Aweswell allege not isolated episodes but a wider sequence: prior knowledge and preparation → call design and recipient selection → selective service or omission → meeting, powers, conflicts and votes → debt, works, licence and operation resolutions → ACTA drafting/closing → no direct communication and third-party discovery → later use in title, collection, works, finance, public support or operation. This is a criminal hypothesis to test, not a judicial conclusion.

The native 4-February invitation and service package are not presently in the repository. The located ACTA proves what meeting and resolutions were recorded; it is not itself the lawful-recipient list, email, postal certificate, return, noticeboard posting or later ACTA-delivery ledger. The public nominal attendee list is partly redacted and cannot exclude an LPB or Matkator proxy.

Recipients must remain separate. LPB was an owner inside the insolvency and requires identification of the insolvency representative and LPH notice address; Matkator was an extraconcursal owner with its own route; Aweswell does not acquire direct LPH notice rights from shareholding alone; and Gil's 2022 representation must be proved capacity by capacity.

Pattern allegation from at least 2016: Gil alleges that certain other meetings or attempts were also kept from his perimeter. This must be tested event by event. The known and attended 26-April-2016 meeting is mandatory limiting evidence, so the repository does not say that every meeting from 2016 onward was concealed.

The preliminary eight-event scan presently contains one direct attributed no-preknowledge example (4-Feb-2022), known/participated counterexamples, unresolved notice routes and one recital-only 2018 event. It establishes the production denominator, not yet a repeated criminal method.

QuestionControlled evidential answerLimit
What does it prove now?An ACTA recording 20.993% present/represented; three visible Acosta Matos representations; resolutions on debt, the sole CAM/JDAM project, works, licences and unitary operation; and a date seventeen days before deed no. 457.It proves the recorded decision instrument and timing, not who was or was not called.
What does the Thompson relay add?If authenticated, it can date actual knowledge after the meeting, prove a third-party rather than direct Community route, identify the circulated ACTA version and compare distribution to Thompson against LPB/Matkator.It does not alone prove the lawful recipient, deliberate omission, what any actor knew or why direct communication failed.
What can prove deliberateness?Known correct recipients/addresses; owner-list versions; native email/headers; certificates and returns; noticeboard records; instructions or admissions aimed at preventing attendance/challenge; a false recital; selective direct ACTA distribution; the authenticated Thompson/upstream chain; and coordinated downstream use.The proof must attach to an identified person with knowledge, purpose and effect; a lone error, indirect receipt or LPH defect is insufficient.
What package would be capable of proving intent?Convergence of unequal selection, conscious omission, internal purpose communications, later concealment and rapid use, together with reasoned exclusion of wrong-address, uncertain insolvency representation, delegated service and administrative-error explanations.No future record can be guaranteed in advance to prove intent. The question is whether the whole package excludes innocent failure to the applicable standard.

Decisive ledger: owner → property/quota → statutory address → issuer → method/time → delivery/return/noticeboard → call → debt warning → representative/power → attendance/vote → direct ACTA communication → third-party relay/actual knowledge → dissent → challenge → enforcement/use.

The four-sibling image: relevant to knowledge and custody, not facial proof of crime.

Four people around a table with plans and a laptop before the Acosta Matos logo
Published no later than 10 February 2021 · Gil attributionLeft to right: Javier, Laura Patricia, José Daniel and Gerardo Zacarías Acosta Matos

Gil identifies Javier as the younger person at the far left and Gerardo Zacarías as the bearded man at the far right. The caret confirms the named identities, not image positions. Controlled BORME records independently place all four within the corporate-governance perimeter, but do not identify pixels.

The image directs production of originals, metadata, photographer/editor records, laptop files, plans, document versions and board packs. If that material reliably ties the scene to Sun Park before the meeting, it may corroborate prior project knowledge and document custodians. The image alone does not prove the plans concern Sun Park, the capture date, invitation knowledge, deliberate exclusion, agreement or criminality.

TrackControlled anchorMissing proof
Community€4,467,793.26 necessary/common-works budget; not itself cash received by CAM/HNT.Invoices, payers, contractor, bank, executed work and one-/four-star separation.
RICPE/RIC€6,570,713.56 in the prospectus versus €6,573,703.10 in another controlled audited reconstruction; the €2,989.54 difference is a reconciliation target, not an offence.Series F/G, investors/RIC, committee/board, waivers, drawdowns, use and repayment.
Regional incentives GC/836/P06HNT; €11,469,714.00 eligible/project investment, €3,440,914.20 subsidy and 60-job commitment.Complete file, costs, other support, payments, jobs, controls and recovery.
FEDERThe permanent MYND plaque expressly identifies FEDER.Programme, operation, percentage, declared expenditure, payments, audits and irregularities.
CAM→HNT→MYNDEconomic-unit segregation and later operation.Transferred properties/rights/liabilities, operator, revenue, EBITDA, refinancing and distributions.
Period Controlled event Additional effect to investigate Mandatory limitation
7–20 Jun 2018 Access control and exclusion; ONA continues an operating and funded architecture. Loss of cashflow, guests, preservation and exit opportunity; possible coercion, usurpation, damage or frustration act by act. Closing conditions, authorship, scope and precise non-closing cause remain open.
Jul–Nov 2018 Post-event minutes; a 2022 recital says comprehensive redevelopment continued to be studied in November. Possible ratification or institutionalisation of control and project. The November original is not located; the later recital cannot replace it.
2019 Judicial non-validation of the separate 31-property / €400,000 branch. Restitution, fruits, Registry, accounting and later reuse of assets. Implementation and destination-of-money chains remain incomplete.
2020–2021 Pilots/project before title; works/estate warnings; expert inspection refused; CAM receives final approval after the third party does not attend/deposit. Defensibility, evidence preservation, value, competition and use of practical availability. A work inside a valid CAM unit could be lawful; the third party missed recorded steps; the 2021 order was reasoned.
26 Jan–4 Feb 2022 Judicial clarifications and Community meeting on project, licences, levy and unitary operation. A new authority, conflict, debt, voting, cost and operation node seventeen days before the deed. An adverse decision does not prove prevarication; the minutes are not the diligenced book or a certified copy.
21 Feb–late 2022 Deed no. 457 and later CAM→HNT segregation. Formal title, economic continuity, finance, operation and benefit tracing. Later title does not cure prior acts or automatically transfer guilt to HNT.
Actor / capacity Additional 2018–2022 relevance Individual proof required
Francisco Mario Matos Matas
Community administration / Pamanil–Pamalexsha
Continuity of debt, voting, records and administration; secretary-administrator and bank lane in 2022. Appointment, contract, custody, accounts, certificates, bank, security, levy, instructions, knowledge and benefit.
Antonio Cogolludo Rojas
Community chair 2017–2018
Authority and implementation of the security/access resolution preceding 7 June. Title, powers, contract, provider, payer, instructions, spatial scope, reaction and office handoff.
Shaila María Cogolludo Ramos
treasury, voting and administrative work
Accounting, voting and access-rule lane during 2018 implementation. Title, powers, bank/accounting functions, employment, communications and exact intervention.
José Daniel Acosta Matos
project, 2022 chair and RICPE
Chairs the meeting, explains the sole project and sits at the junction of design, licence, operation and later benefit. Title at date, powers, conflict/abstention, retainer/fees, units, finance, instructions and benefit.
Laura Patricia Acosta Matos
CAM representation
Witness attribution of 7-June operative instructions and CAM representation at the 2022 node. Mandate, communications, security/contractor relationship, voting, title knowledge and intent.
Javier Acosta Matos
PD-SP-P-0093 · CAEPR-confirmed identity · witness/document-first
BORME identifies him as a CAM director in 2020 and Canarian Hospitality director in 2021; he appears for the separately CAEPR-confirmed Construcciones Acos-Matos, S.L. in 2022. This is an information channel to investigate, not proof of participation. Power, properties/coefficient, actual vote by item, known notices/ACTA, board/project information, conflict, records and benefit. Only objective indications of his own act, knowledge and intent could justify considering investigated-person status with full rights.
Gerardo Zacarías Acosta Matos
PD-SP-P-0094 · CAEPR-confirmed identity · image/document-custody first
Gil identifies him as the bearded sibling at the far right of the published image; BORME records place him in the corporate-governance perimeter. The located ACTA does not record him as a 4-February attendee. Image original and metadata, connection of the plans to Sun Park, board packs, prior knowledge, communications, custody, implementation, conflict and benefit. Office or attributed image presence does not prove agreement or criminal participation.
Francisco de Borja Rodríguez-Batllori Laffitte
LPB Insolvency Administrator
LPB representation, security/access, preservation, valuation, realisation and accounting bridge. Specific duty, notice, practical capacity, act/omission, report to court, causation and lawful alternative.
Magistrate-Judge Alberto López Villarrubia of the then Commercial Court No. 1 of Las Palmas de Gran Canaria Judicial supervision and decisions affecting preservation, evidence, competition and implementation. Exact resolution or required act, available record, competence, objective injustice, historical mental element and effect. Adverse outcome is insufficient.
CAM → Hotel New Trend, S.L.U. (HNT)
separate legal persons
Credit/units/project/award and later segregation of the economic unit. Eligible predicate offence, natural person, benefit, controls, transferred assets/passives/litigation and HNT's own conduct; no automatic successor guilt.

Source control: the €4,467,793.26 total was visually checked against source page 7. LPB's individual amounts come from the controlled reading of the unpublished annex; nominal pages 5–6 remain publicly redacted. The Matkator figure is derived arithmetic and expressly awaits comparison. Method, counter-explanations and decisive evidence →

Unitary reading

From partial access to a financeable, operable hotel asset.

The allegation is not an assortment of incidents. It is a continuing conversion: credit and partial units → Community and insolvency authority → physical control → project and pilots → image of hotel availability → adjudication, refurbishment, finance and operation.

The alleged displacement includes property, possession, business and opportunity.

Gil Marer alleges that LPB lost value and a competitive insolvency exit; that CEXP or its participants lost the residual or reconstituted operating rights they assert, as well as customers, reservations and goodwill; that Matkator and other owners lost control or fruits of non-estate properties; and that Aweswell lost the opportunity to execute the exit platform. The later record documents, through different entities linked to the Acosta Matos project, material control, later LPB title, redevelopment, RIC finance, a regional incentive award and operation as MYND Yaiza. Attribution of each benefit requires an entity-by-entity account.

That does not permit asset value, credit face value, loans, incentive and revenue to be added as one gain. Net enrichment requires entity-by-entity consolidated accounting: actual credit price, debt extinguished, assets received, own capital, loans and repayment, incentive actually paid, related margins, rent, EBITDA, refinancing and distributions.

DocumentedAs separate facts: fragmented title, access control, signed ONA route, direct statement of an installed pilot, promotion before LPB title, adjudication and later operation. Causal linkage remains disputed.
AllegedCommon plan, deliberate use of manufactured authority, intentional frustration of ONA and criminal displacement.
InferredMaterial control allowed the hotel to be presented and developed as a whole before complete title.
UnresolvedExact pilot unit, instructions, money flows, individual knowledge, intent and net enrichment.

Production capable of resolving the case

One complete chain, not isolated explanations.

The unitary criminal hypothesis should be tested by attributing authority, act, knowledge, loss and benefit by date and property.

PackageMissing recordQuestion answered
Security and accessContract, instructions, authorised persons, rosters, reports, CCTV, Guardia Civil, keys and cylinder changes.Who ordered what, over which spaces, and for how long.
Property-by-property mapTitle, possessor, keys, use, works and consent at each date from 2018 to 2022.Where LPB authority ended and non-estate effect began.
Operation and lossPMS, reservations, guests, staff, payroll, suppliers, cash, maintenance and valuations.Which business existed and what was lost, displaced or preserved.
ONA and financeConditions, proof of funds, diligence, committee decisions, 7–20 June communications and formal no-close reason.Which condition failed and whether material control was causal.
Administrator and courtOriginal email, reports, 13 June diary, filings, service, measures, inspections and accounts.What they knew, could do, decided and why.
Atilano / factoryUnit, order, renders, quote, invoice, payment, delivery, photographs, licence and access log.Who commissioned and authorised physical execution of the pilot.
El Corte Inglés EmpresasCRM, CAM visit, four pilots, request for proposal, plans and redevelopment file.Which perimeter was presented and with what title or availability.
Call, ACTA and imageNative call, owner/address list, service/returns/noticeboard, powers, votes and ACTA distribution; image original/metadata, laptop, plans and board packs.Who knew the project, selected recipients, consciously excluded an interest, constructed or withheld the ACTA, and whether the published scene truly links to Sun Park.
Downstream benefitCredit price, dación, CAM–HNT segregation, RIC, aid, capex, operation, debt, income and distributions.What net value each entity obtained and from which source.

Canonical proceeding identity · direct procedural lineage

DI 1103/2018-00 → DP 1132/2018 → Rollo 1010/2018 / Order 804/2018

Origin: the 2 May judicial record says the complaint received on 23 April originated as Diligencias Indeterminadas 1103/2018-00 and was processed as Preliminary Proceedings 1132/2018 under NIG 3500443220180003508 by Investigating Court no. 2 of Arrecife, formerly Mixed Court no. 7.

First instance: the court ordered provisional dismissal on 20 August 2018. Appeal: the Provincial Court of Las Palmas, Section Two, registered Rollo 1010/2018 and issued Order 804/2018 on 13 November. It dismissed both appeals, confirmed the provisional dismissal and stated that no further appeal lay.

Why the four references matter: 1103 is the documented origin reference; 1132 is the criminal-investigation file; 1010 is the appellate roll; 804 is the decision in that roll. They are interlinked, but they are not interchangeable labels. The shared NIG and express origin fields prove the procedural lineage.

Identity boundary: each displayed proceeding/reference is CAEPR-confirmed within one canonical family (PD-SP-R-0023) and the Master IDs LZ-JUD-003/LZ-APP-004. This frozen first-hop route states that result textually; the dedicated lineage register displays the four controlled caret markers. Identity confirmation does not prove conduct, knowledge, criminality, title, possession, liability or that the adverse reasoning was correct.

Right of reply and correction.Atilano Sastre, Inmoturismo, Essenthia, El Corte Inglés Empresas, CAM, the Community, the insolvency administrator, judicial authorities and every person or entity mentioned are invited to identify errors and provide missing records. Every verifiable response will receive equivalent prominence. Atilano and the El Corte Inglés Empresas lead are described as commercial sources, not accused actors. Correct or provide documents →

Sun Park / MYND Yaiza — site and canonical record

MASTER MYND · photographs, attributed accounts and chronology