2018 OFFER · 2021 COMPETITION · 2021–2022 ORDERS · DEED · ACCOUNTS

The central issue is no longer a recalculation of interest: it is whether the transaction implemented retained the identity of the transaction authorised

The signed 25 January 2021 order, the 29 January court notice and deed no. 457 dated 21 February 2022 now allow recognised insolvency credit, mortgage liability, the threshold imposed on a third party, the debt stated as consideration for the dación and the separate sale of non-mortgaged assets to be compared directly. The decisive issue is the documentary bridge between each function.

Primary notarial source recovered · judicial reconstruction and implementation remain open

Scope limit. A documentary or accounting mismatch does not by itself prove nullity, fraud, surplus, bad faith or liability. The more precise question is: which act authorised each change in legal or economic function between offer, competitive publicity, adjudication, deed, Registry and accounting?
Signed judicial orderCourt noticePrimary deed no. 457Party procedural filingImplementation evidence still open

Three primary sources materially sharpen the analysis

EUR 3,079,104.66 → EUR 3,182,000

the EUR 102,895.34 movement has a documentary explanation

The signed 25 January 2021 order reproduces the Provincial Court default-interest amount and later daily accrual until the mortgage-liability cap was reached. This explains the arithmetic movement; it does not by itself determine its classification as finally recognised insolvency credit.

EUR 13,168,082.02

the same figure appears in two different contexts

The 29 January 2021 notice derives it as the sum of the two mortgage components required from a third-party better bidder. Deed no. 457 later uses EUR 13,168,082.02 as the debt serving as consideration for the dación. The numerical identity is now verified; the legal bridge between those functions and the lawfully set-off insolvency credit remains to be demonstrated.

EUR 400,000

the premises line remains separate

The notice separately states EUR 400,000 for assets outside the special privilege. In the reviewed operative and judicial-recap portions of deed no. 457, the dación concerns the mortgaged properties; those sections do not expressly re-execute the premises/pools sale or reconcile the 2018 cash payment.

EUR 14,713,880.31

quantified conditions for a third party

This is the sum of both mortgage components, the EUR 400,000 and EUR 1,145,798.29 in community fees, before then-unquantified taxes and costs. It must not automatically be converted into CAM's price or recognised credit.

EUR 14.8m

the competition ceased to be hypothetical

A third-party bidder documented an acquisition proposal dated 8 February 2021 for EUR 14.8 million covering the identified property perimeter. Only the bidder's name is anonymised in the public record; the bid, its terms and every related fact remain visible. Procedural filing, authority/funds and treatment at the licitation still require documentary closure.

5 calendar days

the deed creates a verifiable downstream trail

Deed no. 457 requires the insolvency administrator to communicate it to the Mercantile Court within five calendar days and sets out cancellation requests. The next control point is the actual court filing, order/mandamiento and Registry implementation.

The same number can perform different legal functions: the transition must be proved

Reading rule: recognised credit ≠ mortgage liability ≠ third-party bid threshold ≠ debt stated as consideration in the dación ≠ Registry value ≠ any insolvency surplus.
AmountSource currently controlledFunction that can be statedWhat cannot be presumed
EUR 3,079,104.6625 January 2021 order, reciting the 23 July 2019 Provincial Court decisionFirst-rank default interest within the better-bid calculation, with later daily accrual.That it was automatically the final privileged credit to be set off.
EUR 3,182,00025 January order + 29 January noticeMortgage cap reached and component required from a third-party better bidder.That the cap automatically became recognised insolvency credit.
EUR 13,168,082.0229 January 2021 notice + deed no. 457, pp. 28–29January: mortgage-component better-bid subtotal. February: debt stated as consideration for the dación.That numerical identity alone proves the legal correctness/classification of the credit or the absence of any residual.
EUR 400,000Notice + sale structure quoted in the 2022 appealsSeparate component for assets not affected by special privilege.That it was absorbed, refunded, set off or legally regularised without the banking/notarial/Registry/accounting chain.
EUR 14.8mThird-party bidder proposal dated 8 February 2021Concrete documented competitive proposal.That it was admitted, fully funded or wrongly excluded without the licitation record.

The competition was real; its outcome still needs reconstruction

A stronger control point. The court notice did not open a merely theoretical possibility: a third-party bidder documented a EUR 14.8m proposal. That permits an objective inquiry into how the proposal was tested against the published conditions and why the process ultimately ended with CAM's proposal.

The website anonymises only the third-party bidder's name; the bid, its terms, procedural treatment and every related fact remain visible. For the relevant insolvency question, its procedural and economic function is enough: a EUR 14.8m proposal existed against then-quantified components totalling EUR 14,713,880.31, before additional taxes and costs that were not yet quantified. The signed 18 May 2021 Auto establishes the procedural outcome—nonappearance and nondeposit followed by definitive approval of CAM's proposal—but not the contents of the missing appearance record or every downstream condition. The third party's court filing, authority, proof of funds, judicial communications and the appearance minute/recording remain to be closed.

Do not pre-judge the result. A EUR 14.8m offer does not by itself prove that the third party met every requirement or should have received the adjudication. It does make the competitive process a material, verifiable control point.

The judicial spine: the 26 January orders were clarifications, not the original award

Date and function control. Two complete signed orders dated 26 January 2022 clarified the 15 October 2021 rulings and made no new award. Deed no. 457 separately recites 22 January on one page and 26 January on another; that internal notarial date conflict requires reconciliation and cannot turn either clarification into original adjudication authority.
MilestoneSource statusWhat can safely be statedBridge still open
24 Oct 2019Signed order locatedNon-validation control over the separate 2018 premises/pools line.EUR 400,000: bank, ledger, any refund/retention/set-off and final title.
25 + 29 Jan 2021Primary judicial sources locatedInterest reconstruction, mortgage cap and quantified conditions imposed on a third party.Final credit classification and the transition of each amount into its later legal function.
18 May 2021 · E044Complete signed five-page Auto 164/2021 locatedDefinitively approved CAM's proposal after the third-party bidder's nonappearance and nondeposit; it does not prove downstream completion.Applications, powers, appearance minute/recording, service/finality and implementation.
15 Oct 2021 · E046Complete signed five-page Auto locatedDismissed LPB/Aweswell challenges to the 18-May approval, confirmed it and described an improvement-of-offer process rather than a formal auction.Underlying challenges/annexes, service/finality and implementation.
15 Oct 2021 · E047Complete signed two-page Auto locatedDismissed challenges to the 12-May providencia as moot while using auction/adjudication terminology later clarified.Underlying challenges/annexes, service/finality and implementation.
22 Jan 2022 · deed recital onlyConflicting internal recital in deed 457; no distinct judicial act establishedOne deed page says 22 January and another says 26 January. Both located judicial originals are dated 26 January.Notarial source/explanation, supplied testimony and any rectification; not recovery of a presumed 22-January Auto.
26 Jan 2022 · E050 / clarification AComplete signed two-page Auto locatedClarified E047's 12-May branch: the event was a better-offer licitation appearance, not an auction. It made no new award or conveyance.Application, opposition, service/finality and exact testimony/deed use.
26 Jan 2022 · E051 / clarification BComplete signed three-page Auto locatedClarified/completed E046's 18-May branch and recorded July-2021 ownership publicity as raised but irrelevant to finca realisation; it made no new award or whole-hotel title finding.Application, opposition, service/finality and exact testimony/deed use.
21 Feb 2022 → Registry → accountsPrimary deed recovered; downstream implementation incompleteThe deed documents the dación and the stated debt consideration.Five-day court communication, mandamiento, finca-by-finca Registry chain and final accounting bridge.

Open the judicial-act register in JSON format. It is a partial public seed: signed primary sources, the Correction Register and the Missing Evidence Register control over it.

Authorised transaction versus notarial implementation

Offer / Plan · 2018

The documentary record reconstructs a dación of mortgaged properties, a separate EUR 400,000 sale of non-mortgaged assets and a waiver clause whose wording and effect must be reconciled against the later acts.

Definitive authorisation · 2021

The complete signed five-page E044 / Auto 164/2021 of 18 May 2021 definitively approved CAM's proposal after the third-party bidder's nonappearance and nondeposit. That approval remained subject to finality, lawful debt, deed, EUR 400,000, costs, reporting, cancellation, Registry and accounting steps that must be proved separately.

Deed no. 457 · 21 February 2022

Primary source recovered: 76 pages. The deed transfers the described mortgaged properties to CAM and states EUR 13,168,082.02 as the debt serving as consideration for the dación. It also requires communication to the court within five days and sets out downstream cancellation requests. The legal correctness of the amount and actual Registry/accounting consequences must be proved separately.

The identity question is now more concrete. It is no longer disputed whether EUR 13,168,082.02 appears in the deed: it does. The issue is which title turns the competitive-threshold figure into debt legally usable as consideration for the dación, how that reconciles with the definitive texts and what consequence followed for the estate.

The deed also separates what it proves from what remains open

It proves

The deed's identity, protocol 457, date, appearances, conveyance of the described properties, stated debt consideration and the communication/cancellation obligations and requests.

It does not prove by itself

That every credit component was legally correct and finally privileged, that community/tax obligations were actually paid, that the Registry cancelled exactly as requested or that the estate had no residual.

Its existence does not automatically cure

The separate 2018 premises/pools transaction that was not judicially validated in 2019. The later title, entry and economic treatment that may have regularised that line must be identified.

What remains needed to close the chain

  • Located orders—context and implementation: underlying applications/challenges, appearance record, service/finality and testimony/deed use for E044, E046, E047, E050 and E051. The 22-January date is solely a conflicting deed recital, not a missing judicial original.
  • 2021 and 2022 testimonios: full contents and notarial/Registry use; the 325/646-page counts are not published as fact unless verified.
  • Interest: CAM certificate/calculation taking EUR 3,079,104.66 to the EUR 3,182,000 cap, including days, rate, service and challenge.
  • Third-party bidder: procedural filing, authority/funds evidence and the minute or recording of the 18 May 2021 licitation.
  • Post-deed communication: court filing within/after five days, ensuing order/mandamiento and Registry cancellation date.
  • EUR 400,000: bank evidence, ledger, effect of the 2019 non-validation, any refund/retention/set-off and the final premises/pools title.
  • Waiver: exact original clause and any later act preserving, modifying or extinguishing it.
  • Final accounts: complete bridge from credit and interest through dación, payments, cancellations and any residual.
  • Perimeter: finca-by-finca crosswalk between each order, the LPB estate, deed, Registry and any Matkator/third-party property that must remain outside.

How this strengthens the position without overstating it

1. It replaces an inference with a notarial fact

EUR 13,168,082.02 no longer depends on a later summary: the deed verifies it as debt serving as consideration for the dación. That makes the title-and-classification question materially more concrete.

2. It adds a real market-control point

The EUR 14.8m third-party proposal, with only the bidder's name anonymised, allows the published threshold, actual competition, outcome and estate benefit to be compared without turning the bidder into a public protagonist.

3. It separates order from implementation

The existence of an order, deed or Registry entry is not used as an automatic substitute for the next evidential link. The chain is tested act by act and property by property.

Proportionate relief. First reconstruct title, debt, accounts and the correspondence between authorisation and implementation. Only then can counsel assess accounting correction, integration of a proven residual, partial ineffectiveness, retroaction or another remedy.

Validation status

TopicStatusNext control
25 January 2021 orderPrimary signed judicial source locatedBind underlying interest certificate/calculation and exact Provincial Court source.
29 January 2021 court noticePrimary court source locatedKeep the legal functions of EUR 13.168m, EUR 400,000 and community fees separate.
18 May 2021 · E044Complete signed Auto 164/2021 located; definitive approval establishedBind applications, powers, appearance minute/recording, service/finality and implementation.
15 Oct E046/E047 + 26 Jan E050/E051Four complete signed Autos located; the 26-January pair are clarifications and make no new awardBind challenges/applications, service/finality and testimony/deed use; reconcile 22 January solely as the conflicting deed recital.
Third-party proposal · EUR 14.8mDocument located; only the bidder's name publicly anonymised; bid and facts preservedClose filing, authority/funds and licitation treatment.
Deed no. 457 · 21 February 2022Primary notarial source recovered and reviewedReconcile debt, orders, court communication, mandamiento, Registry and accounts.
Premises / EUR 400,000Separate component established; cure/final title openLedger, bank, non-validation, later title and Registry chain.
Final accounts / surplusPrimary closure pendingAccounts, balance, bank, cancellations and final decision.
Standing, finality and routeCounsel validation requiredParty map, prior decisions, time rules and transitional law.

Corrections and response. This is a living record. A higher-ranked primary source corrects any lower-ranked reconstruction. Documented material that weakens the thesis should be incorporated with the same provenance discipline.

Connection to the Valencia banking claim

This dossier connects to the chronology, documents or rights considered in Aweswell v CaixaBank. The banking claim, credit chain and each actor’s conduct retain their separate scope. Read both litigation positions, then return to this dossier; no common liability is inferred.

CaixaBank Valencia · Claim and defence