Cross-track visualisation · 4 September 2026

Puzzle

The same people, firms, documents and dates viewed as one connected evidence graph—without turning proximity into proof.

documented factreported contactactor representationunresolved / production target

Connected perimeter

Project / asset

Sun Park · Concurso 36/2012 · later RICPE project perimeter

The central object connecting title, insolvency, investment representation, due diligence and later production requests.

AC
Actor

Francisco de Borja Rodríguez-Batllori Laffitte

Administrador Concursal. Linked here to the reported 3 Jul 2015 contact and the insolvency record.

JRS
Actor

Javier Rubio Sanz

Uría Menéndez lawyer. Material documentary witness node; representation of the AC is not established by the reported contact alone.

JA
Actor

José Acosta

Source of attributed 2020 project representations requiring independent title/encumbrance verification.

Firm

Uría Menéndez

Legal-processing/advisory node. Scope, mandate, information flow and conflict screening remain documentary questions.

Firm

PwC

Due-diligence node described in RICPE materials, later qualified by the 20 Jul 2021 certification.

Entity

RIC Private Equity

Investment and project-presentation node; issuer of the 20 Jul 2021 certification.

Entity

CAM / Acosta Matos perimeter

Source/ownership representation node requiring reconciliation with title, charges and insolvency records.

Event bridges

3 Jul 2015 · reported contact

AC → Javier Rubio Sanz / Uría

Chronology contact only. It does not itself prove a mandate, conflict or improper information flow.

11 Nov 2020 · presentation

Uría + PwC + RICPE + José Acosta

Project-processing architecture and attributed statements including “libres de cargas” and Sun Park / €12m. Those are representations, not independent title proof.

20 Jul 2021 · primary record

RICPE certification

Sun Park described as very early study/negotiation; complete legal/tax/financial/technical/insurance DD had not yet occurred because no letter of intent had been signed.

9 Jul 2026 · production request

Uría / PwC title-and-charges material requested

Recovered consolidated version requests reports/notes on title, encumbrances, suitability, risks and real project scope. Filing-receipt identity limits remain explicit.

Document anchors

Primary source

RICPE certification · 20 Jul 2021

Binary SHA-256: 241928ea649933609441644567dd50cb97b87d17bafac850c90aca3bbda37b80

Court filing

CAM filing · 21 Jul 2021

Binary SHA-256: efda379e7b2ae0bfbbd80859a42332d5aae99ccd9644a04003760158b54b05fd

Recovered filing version

Consolidated Control 21 · 9 Jul 2026

Binary SHA-256: 6741dcbfb1a2201c7773141bcfad292d101041560e599aac39178ea9530623c9

Reading rule: this graph is an investigative navigation aid. A line between nodes means the underlying record creates a documentary connection that should be tested. It is not a finding of common purpose, representation, conflict, liability or criminal conduct.