| April 2015 | Haya communicated that the LPB proposal had been analysed in a weekly creditor-side forum against the debt holder's criteria. | The workout reached a functioning decision channel. This was not passive receipt. |
| 18 May 2016 | After Cuatrecasas submitted a PH122/Cerberus proposal, Haya stated that “the creditor” had rejected its terms and no signed version was required. | A creditor decision existed. The missing mandate and committee record now conceal who decided, why and under what authority. |
| May 2017 | Haya received the Bankia/SWAP and PH122 two-mortgage architecture, prior offers, convenio and viability plan; it identified Cerberus interlocutors and separately promised a Bankia contact. | The perimeter had direct notice of the credits, the proposed exit and the distinction between upstream Bankia and PH122/Cerberus lanes. |
| 20 Oct 2017 → Jan 2018 | CAM acquired the credits and rapidly advanced a debt/valuation/dación proposal. | The later acquirer did not arrive in an evidential vacuum; its due-diligence and disclosure file should show what history travelled with the asset. |
| 25 Jan → 5 Mar 2018 | The Insolvency Administrator directly ended LPB counsel's formal mandate in the deed-and-price proceeding; LPB then withdrew and the route ended by withdrawal. | An institutional gate affecting assignment information and LPB representation is directly documented. The estate-interest reason remains missing. |
| 2018 | ACTÚA's low valuation entered the CAM/AC route and was contemporaneously challenged by GESVALT on methodology and physical condition. Material access/control effects then arose before formal title. | Value and control began converging with the creditor route years before the deed. |
| 2021–2022 | The judicial route culminated in Protocol 457: 159 mortgaged properties transferred to CAM against stated debt of €13,168,082.02. Its six printed components total €13,065,186.68; the €102,895.34 difference matches the step from €3,079,104.66 first-rank default interest to the €3,182,000 cap. | The arithmetic identity is explained; the source calculation, payability of each component, threshold-to-extinguished-debt bridge and preservation of value above lawful debt remain open. |
| 2022 onward | The Sun Park economic unit was segregated to HNT by stated universal succession. | The current end-state depends economically and legally on upstream bridges whose exact independence and liabilities must be proved. |