26 May → 23 June 2020
- 26 May: formal Cuatrecasas withdrawal from representing Aweswell in the insolvency proceeding because of non-payment.
- 2 June: Gil sends Íñigo a five-page draft letter, a private 25-page Playa Blanca project annex and hotel-state material.
- 3 June: Íñigo replies that, «after checking internally», he is not permitted to proceed with the draft.
- 3 June: he identifies Plácido Molina and Juan Francisco Rodríguez Estella from the «claims and collection dept» as responsible for the file.
- 23 June: those recovery leads directly receive the original letter and the hotel/estate summary because it was «key to resolve the issues regarding the work done».